    Cloud Migration Strategies: Moving Legacy Applications to AWS/Azure Without Downtime

    Author Image
    Manikandan Arumugam
    Cloud migration is no longer a question of if, but when and how. By 2026, 85% of enterprises have migrated critical workloads to cloud, driven by cost savings (30-50% for optimized deployments), scalability, and operational efficiency.But the path from on-premises data centers to cloud is littered with failed migrations: applications that went down for days during cutover, data loss incidents, budget overruns of 200-300%, and projects abandoned mid-migration after wasting millions.The statistics are sobering: 74% of cloud migrations exceed budget. 68% take longer than planned. 51% experience significant production incidents during migration. The average enterprise migration costs $2.3M and takes 18 months, with 30% of organizations reporting they would approach it differently if they could start over.For CTOs and cloud architects responsible for migrating legacy applications in 2026, the challenge isn't just moving workloads to cloud. It's doing so without business disruption, data loss, cost overruns, or creating technical debt that haunts you for years.At Askan Technologies, we've executed 42 cloud migrations over the past 24 months, moving everything from simple web applications to complex legacy systems with decades of technical debt, serving clients across US, UK, Australia, and Canada with zero-downtime requirements and strict data compliance.The data from these migrations reveals clear patterns: well-planned migrations reduce costs 35-55% while maintaining 99.95%+ uptime. Poorly planned migrations create chaos, exceed budgets by 150-250%, and take 2-3x longer than estimated.

    The Five Migration Strategies (The 6 Rs)

    Before diving into execution, understand your options. Not every application should be migrated the same way.

    Strategy 1: Rehost (Lift-and-Shift)

    What it is:
    • Move application to cloud with minimal changes
    • Virtual machines replicated as cloud instances
    • Same architecture, same code, different infrastructure
    Example:
    • On-premises: Windows Server 2019 + SQL Server + .NET application
    • AWS migration: EC2 Windows instances + RDS SQL Server + same .NET code
    Pros:
    • Fastest migration (weeks to months)
    • Lowest risk (application unchanged)
    • Immediate cost savings (20-30% from infrastructure efficiency)
    • Can optimize later (get to cloud first, optimize second)
    Cons:
    • Misses cloud-native benefits (no auto-scaling, serverless, managed services)
    • May not achieve maximum cost savings (30-40% vs 50-70% for re-architected apps)
    • Technical debt carried forward
    When to use:
    • Legacy applications too risky to change
    • Time-sensitive migrations (data center lease expiring)
    • Initial cloud migration (prove value quickly)
    • Applications with stable requirements (not growing)
    Typical cost savings: 20-35% Typical timeline: 2-6 months for medium application Risk level: Low

    Strategy 2: Replatform (Lift-Tinker-and-Shift)

    What it is:
    • Migrate with minor optimizations
    • Replace some components with cloud-managed services
    • Application logic unchanged, infrastructure partially modernized
    Example:
    • On-premises: Self-managed MySQL on Linux VM
    • AWS migration: RDS MySQL (managed) + EC2 for application + same code
    Changes:
    • Database: Self-managed → RDS (managed service)
    • Backups: Manual scripts → Automated RDS backups
    • High availability: Manual failover → Multi-AZ automatic failover
    • Application code: Unchanged
    Pros:
    • Better cloud optimization than pure lift-and-shift
    • Lower operational overhead (managed services)
    • Moderate risk (small changes, big benefits)
    • 30-50% cost savings achievable
    Cons:
    • More complex than rehost (testing required)
    • Longer timeline than pure lift-and-shift
    • Some application changes needed (connection strings, configurations)
    When to use:
    • Applications that can benefit from managed services
    • Databases that have cloud equivalents (MySQL, PostgreSQL, SQL Server)
    • Organizations comfortable with modest changes
    • Seeking balance of speed and optimization
    Typical cost savings: 30-50% Typical timeline: 3-8 months Risk level: Low-Medium

    Strategy 3: Refactor / Re-architect

    What it is:
    • Redesign application for cloud-native architecture
    • Rewrite portions to use serverless, containers, microservices
    • Significant code and architecture changes
    Example:
    • On-premises: Monolith application on single server
    • AWS migration: Microservices on ECS + Lambda functions + API Gateway + DynamoDB
    Changes:
    • Architecture: Monolith → Microservices
    • Database: SQL → NoSQL (DynamoDB)
    • Compute: VMs → Containers + Serverless
    • Scaling: Manual → Auto-scaling
    Pros:
    • Maximum cloud benefits (scalability, cost optimization, resilience)
    • 50-70% cost savings possible
    • Better performance and user experience
    • Modern, maintainable architecture
    Cons:
    • Highest risk (extensive changes)
    • Longest timeline (6-18 months)
    • Highest cost upfront ($200K-$2M depending on application size)
    • Requires significant developer time
    When to use:
    • Applications requiring major improvements anyway
    • Strategic applications with long-term importance
    • Applications with scaling or performance issues
    • Organizations with budget and time for transformation
    Typical cost savings: 50-70% (long-term) Typical timeline: 6-18 months Risk level: High

    Strategy 4: Repurchase (Replace with SaaS)

    What it is:
    • Abandon custom application
    • Replace with commercial cloud software (SaaS)
    Example:
    • On-premises: Custom-built CRM system (15 years old, $300K annual maintenance)
    • Cloud: Salesforce ($150K annual subscription)
    Pros:
    • Eliminate maintenance burden entirely
    • Modern features without development
    • Fast migration (data migration only, no code)
    • Predictable costs
    Cons:
    • Loss of customization
    • Vendor lock-in
    • Data migration complexity
    • Change management (users adapt to new system)
    When to use:
    • Commodity applications (CRM, email, HR, accounting)
    • Custom apps with poor ROI (high maintenance, low value)
    • Organizations lacking resources to maintain custom software
    Typical cost impact: Variable (often 30-50% cheaper long-term) Typical timeline: 2-6 months Risk level: Medium (data migration, user adoption)

    Strategy 5: Retire

    What it is:
    • Turn off application, don't migrate
    Example:
    • Discovered application has 3 users, last update 5 years ago
    • Usage logs show no activity in 6 months
    • Retire instead of migrating
    Pros:
    • Eliminate costs entirely
    • Reduce migration scope
    • Simplify infrastructure
    Cons:
    • Must verify truly unused (avoid surprises)
    • Data retention requirements (may need to archive)
    When to use:
    • Redundant applications (replaced by newer systems)
    • Unused or rarely-used applications
    • Shadow IT discovered during migration assessment
    Typical impact: 5-15% of applications retired during migration Savings: 100% of application costs

    Strategy 6: Retain (Don't Migrate)

    What it is:
    • Keep application on-premises, don't migrate
    Example:
    • Mainframe system with compliance requirements
    • Application scheduled for retirement in 6 months
    • Hardware dependencies that can't move to cloud
    When to use:
    • Applications retiring soon (within 12 months)
    • Regulatory/compliance blockers
    • Hardware dependencies (specialized equipment)
    • Cost-benefit doesn't justify migration

    The Zero-Downtime Migration Framework

    Most migrations can achieve zero or near-zero downtime with proper planning.

    Phase 1: Discovery and Assessment (Weeks 1-4)

    Objective: Understand what you're migrating before starting.Step 1: Application inventoryDocument every application:
    • Application name and purpose
    • Technology stack (OS, language, frameworks, databases)
    • Dependencies (what it talks to, what talks to it)
    • Users and business criticality
    • Current infrastructure (servers, storage, network)
    • Performance requirements (latency, throughput)
    • Compliance requirements (data residency, encryption, audit logs)
    Tools:
    • AWS Application Discovery Service (automated discovery)
    • Azure Migrate (Azure-focused discovery)
    • CloudEndure (agentless discovery)
    • Manual documentation (spreadsheets, diagrams)
    Step 2: Dependency mappingCritical for avoiding outages.Map:
    • Application dependencies (API calls, database connections)
    • Network dependencies (firewalls, VPNs, load balancers)
    • Data dependencies (shared databases, file systems)
    • Authentication dependencies (Active Directory, SSO)
    Tools:
    • AWS Migration Hub (dependency tracking)
    • Azure Service Map (Azure discovery)
    • Manual network diagrams
    Common discovery: 40-60% more dependencies than initially documented.Step 3: Migration strategy selectionFor each application, choose from 6 Rs based on:
    • Business criticality
    • Technical complexity
    • Available budget and timeline
    • Risk tolerance
    Typical distribution:
    • Rehost: 40-50% of applications (fastest, lowest risk)
    • Replatform: 20-30% (balance of speed and optimization)
    • Refactor: 10-15% (strategic applications worth investment)
    • Repurchase: 5-10% (replace with SaaS)
    • Retire: 10-15% (unused or redundant)
    • Retain: 5-10% (not ready to migrate)
    Step 4: Create migration planPrioritize migrations:
    1. Wave 1 (Pilot): Simplest, non-critical apps (prove process)
    2. Wave 2: Medium complexity, moderate criticality (build confidence)
    3. Wave 3: Complex or critical apps (experience gained)
    4. Wave 4: Most complex/critical (final migrations)
    Timeline: 3-6 waves over 6-18 months for typical enterprise

    Phase 2: Pilot Migration (Weeks 5-10)

    Objective: Prove migration process with low-risk application.Select pilot application:
    • Non-critical (outage acceptable)
    • Simple architecture (few dependencies)
    • Representative of broader portfolio (learnings apply)
    Execute pilot:
    1. Set up cloud landing zone (networking, security, access)
    2. Migrate pilot application using chosen strategy
    3. Test thoroughly in cloud environment
    4. Cutover to production (accept brief downtime for pilot)
    5. Monitor for 2-4 weeks
    6. Document lessons learned
    Typical findings:
    • Underestimated data transfer time (40% of pilots)
    • Missed dependencies discovered (55% of pilots)
    • Performance differences vs on-premises (30% of pilots)
    • Security/compliance gaps (25% of pilots)
    Value: Learning on low-risk app prevents failures on critical migrations.

    Phase 3: Production Migration Execution (Weeks 11+)

    Objective: Migrate applications with zero or minimal downtime.Zero-downtime migration pattern:Step 1: Replicate infrastructure (Week 1)Build cloud environment:
    • Provision compute instances
    • Set up databases
    • Configure networking and security
    • Deploy application code
    Step 2: Set up data replication (Week 1-2)Continuous replication from on-premises to cloud:
    • Database replication (MySQL replication, SQL Server Always On, AWS DMS)
    • File system replication (rsync, AWS DataSync, Azure File Sync)
    • Initial full copy + continuous delta sync
    Step 3: Parallel operation (Weeks 2-4)Both environments running:
    • On-premises: Serving production traffic
    • Cloud: Receiving replicated data, ready to take over
    • Replication lag: Ideally under 1 second
    Step 4: Testing and validation (Weeks 3-4)Thoroughly test cloud environment:
    • Functional testing (all features work)
    • Performance testing (meets SLAs)
    • Security testing (access controls, encryption)
    • Disaster recovery testing (backup/restore)
    Step 5: Cutover (Day 0 - Zero Downtime)5-minute to 2-hour cutover window:Minute 0-5: Traffic redirection
    • Update DNS records (TTL should be lowered days before)
    • Update load balancer targets
    • Activate cloud environment
    Minute 5-10: Final data sync
    • Stop writes to on-premises database
    • Final replication sync (catch up last few seconds of data)
    • Promote cloud database to primary
    Minute 10-15: Validation
    • Verify application responding
    • Test critical workflows
    • Monitor error rates
    Minute 15-60: Observation
    • Monitor traffic patterns
    • Watch for errors or performance issues
    • Keep on-premises environment ready for rollback
    Hour 1-24: Stabilization
    • Continue monitoring
    • Address any issues
    • Prepare to decommission on-premises (after 30-day stability period)
    Rollback plan: If issues detected in first hour, revert DNS to on-premises. Data loss: only last 5-10 minutes (acceptable for most applications).Step 6: Optimization (Weeks 5-8)After stable in cloud:
    • Right-size instances (reduce over-provisioning)
    • Implement auto-scaling
    • Purchase reserved instances (40-70% discount)
    • Enable cost monitoring and alerts

    Real Implementation: Financial Services Migration

    Company Profile

    Industry: Wealth management firm Scale: 8 applications, 24 servers on-premises Data: 12TB database, 40TB file storage Users: 2,500 financial advisors, 50,000 end clients Compliance: SEC, FINRA (strict data requirements)Previous infrastructure:
    • On-premises data center (lease expiring in 18 months)
    • Aging hardware (6-8 years old, expensive maintenance)
    • Annual cost: $420K (hardware, data center, maintenance)
    • No disaster recovery (single data center)
    Migration objectives:
    • Zero downtime (market hours critical, $250K/hour revenue impact)
    • Full compliance (SEC audit during migration)
    • Cost reduction (30%+ target)
    • Improved disaster recovery (4-hour RTO requirement)

    Migration Execution (14 Months)

    Months 1-2: AssessmentApplication inventory:
    • Core trading platform (Java, Oracle DB, 8 servers)
    • Client portal (ASP.NET, SQL Server, 4 servers)
    • Reporting system (Python, PostgreSQL, 3 servers)
    • Document management (PHP, MySQL, 2 servers)
    • Email (Exchange Server, 4 servers)
    • 3 internal tools (various technologies, 3 servers)
    Strategy per application:
    ApplicationStrategyRationale
    Trading platformReplatformReplace Oracle with RDS Oracle, minimal code changes
    Client portalRehost.NET framework, lift-and-shift to EC2
    Reporting systemRefactorRedesign for Lambda + Aurora PostgreSQL
    Document managementRepurchaseReplace with SharePoint Online
    EmailRepurchaseMigrate to Office 365
    Internal toolsRetire2 unused, 1 replaced by new system
    Dependencies discovered:
    • Trading platform depends on market data feed (hardware VPN required)
    • Client portal integrates with 6 third-party APIs
    • All systems authenticate via Active Directory (must migrate first)
    Months 3-4: Pilot migration (Reporting system)Why chosen as pilot:
    • Non-critical (outage acceptable)
    • Refactor strategy (test most complex approach)
    • Independent (no critical dependencies)
    Results:
    • Migration completed in 6 weeks
    • Zero downtime achieved (parallel operation, DNS cutover)
    • Performance improved 40% (Lambda auto-scaling)
    • Cost reduced 65% ($8K/month → $2.8K/month)
    • Lessons learned: Data transfer took 2x estimated, VPN bandwidth insufficient
    Months 5-6: Infrastructure foundationBuilt AWS landing zone:
    • VPC with private/public subnets
    • VPN connection to on-premises (high bandwidth for data transfer)
    • Active Directory in AWS (replica of on-premises)
    • Security groups, IAM roles, encryption keys
    • Monitoring and logging infrastructure
    Cost: $60K setupMonths 7-9: Email and document migration (Quick wins)Email to Office 365:
    • Migrated 2,500 mailboxes over 4 weekends
    • Hybrid mode (both systems active during migration)
    • Zero downtime, users unaware of migration
    • Cost: $45/user/year vs $120/user/year on-premises
    • Savings: $187K annually
    Document management to SharePoint:
    • 40TB of documents migrated
    • Parallel operation for 2 months (dual-write)
    • Retired on-premises system after validation
    • Cost: $30K/year vs $85K/year (hardware + maintenance)
    • Savings: $55K annually
    Months 10-12: Critical applications (Trading platform, Client portal)Trading platform (Zero-downtime cutover):Week 1-4: Build cloud infrastructure
    • 8× EC2 instances (t3.2xlarge, right-sized from initial m5.4xlarge)
    • RDS Oracle Multi-AZ (r5.2xlarge)
    • Application Load Balancer
    • Auto-scaling group (6-12 instances)
    Week 5-8: Data replication
    • Oracle GoldenGate replication (on-premises → RDS)
    • Initial 12TB transfer over VPN (4 days)
    • Continuous delta replication (1-second lag)
    Week 9-10: Testing
    • Functional testing (all trading workflows)
    • Performance testing (2x expected load)
    • Failover testing (simulated on-premises failure)
    • Security audit (SEC compliance verified)
    Week 11: Cutover (Monday 6 PM after market close)Timeline:
    • 6:00 PM: Stop new trades, let existing settle (15 minutes)
    • 6:15 PM: Final database sync
    • 6:20 PM: Update DNS, activate cloud
    • 6:25 PM: Validation testing
    • 6:35 PM: Monitor production traffic
    • 7:00 PM: Declare cutover successful
    Downtime: 10 minutes (after market hours, zero customer impact)Results:
    • Performance: 25% faster (SSD storage on RDS)
    • Availability: 99.98% (vs 99.5% on-premises)
    • Cost: $18K/month vs $28K/month on-premises
    • Savings: $120K annually
    Client portal (Similar approach):
    • Rehosted to EC2 + RDS SQL Server
    • Zero-downtime cutover over weekend
    • Downtime: 5 minutes (DNS propagation)
    • Cost reduction: 32%
    Months 13-14: Optimization and decommissioningCloud optimization:
    • Right-sized instances based on 30-day utilization
    • Purchased reserved instances (1-year term)
    • Implemented auto-scaling for variable workloads
    • Enabled cost monitoring and alerts
    On-premises decommissioning:
    • Retired all migrated servers
    • Maintained minimal infrastructure for 60 days (safety)
    • Exited data center lease early (negotiated exit)
    • Sold equipment (recovered $40K)

    Final Results

    Cost comparison (Annual):
    CategoryOn-PremisesAWS CloudSavings
    Compute$180K$95K47%
    Storage$85K$42K51%
    Database licenses$120K$78K (RDS includes license)35%
    Data center lease$35K$0100%
    Total$420K$215K49%
    Annual savings: $205,000Performance improvements:
    • Application response time: 340ms → 250ms (26% faster)
    • Database query time: 180ms → 120ms (33% faster)
    • Uptime: 99.5% → 99.98% (85% reduction in downtime)
    • Disaster recovery: None → 4-hour RTO (compliance met)
    Migration costs:
    • Assessment and planning: $45K
    • Pilot migration: $25K
    • Infrastructure setup: $60K
    • Migration execution: $120K
    • Training and documentation: $20K
    • Total: $270K
    ROI calculation:
    • Migration cost: $270K
    • Annual savings: $205K
    • Payback period: 16 months
    • 5-year ROI: 280%
    Business benefits:
    • SEC compliance: Passed audit during migration
    • Disaster recovery: New capability (was zero)
    • Scalability: Can handle 3x load without infrastructure changes
    • Security: Enhanced (encryption at rest/transit, MFA, audit logging)

    Common Migration Pitfalls

    Pitfall 1: Underestimating Data Transfer Time

    Problem: 100TB database, 100Mbps connection, "should take a week"Reality:
    • 100TB = 800,000,000 megabits
    • 100Mbps = 12.5 megabytes/second theoretical
    • Actual: 6-8 MB/s (network overhead, throttling)
    • Time: 145-193 days at 6-8 MB/s continuous
    Solution:
    • Use AWS Snowball for large datasets (ship physical device)
    • Parallel transfers (multiple connections)
    • Compress data before transfer
    • Incremental sync (initial bulk + continuous delta)

    Pitfall 2: Ignoring Network Dependencies

    Problem: Migrate application, discover it calls 15 on-premises APIsResult: Application broken in cloud, can't reach dependenciesSolution:
    • Complete dependency mapping before migration
    • Establish VPN or Direct Connect early
    • Test connectivity before cutover
    • Migrate dependencies first or plan hybrid operation

    Pitfall 3: No Rollback Plan

    Problem: Cutover fails, no way to restore service quicklyResult: Extended outage while scrambling to fixSolution:
    • Document rollback procedure
    • Keep on-premises environment intact for 30-60 days
    • Test rollback during pilot
    • Define rollback triggers (error rate > 5%, latency > 2x normal)

    Pitfall 4: Inadequate Testing

    Problem: Minimal testing in cloud, "it should work the same"Result: Production issues discovered by usersSolution:
    • Functional testing (all features)
    • Performance testing (2x expected load)
    • Security testing (penetration tests)
    • User acceptance testing (real users validate)

    Pitfall 5: Forgetting Compliance

    Problem: Migrate first, think about compliance laterResult: Failed audit, potential fines, forced remediationSolution:
    • Involve compliance team early
    • Document controls (encryption, access, audit logs)
    • Get compliance signoff before cutover
    • Conduct audit during migration (prove ongoing compliance)

    AWS vs Azure Migration Tools

    AWS Migration Tools

    AWS Application Discovery Service:
    • Automated discovery of on-premises applications
    • Dependency mapping
    • Cost: Free
    AWS Database Migration Service (DMS):
    • Database replication with minimal downtime
    • Supports 20+ source/target combinations
    • Cost: $0.50-$3/hour depending on instance size
    AWS Server Migration Service (SMS):
    • Automated VM migration to EC2
    • Incremental replication
    • Cost: Free (pay for EC2 and data transfer)
    AWS DataSync:
    • Fast data transfer for file systems
    • 10x faster than open-source tools
    • Cost: $0.0125 per GB transferred

    Azure Migration Tools

    Azure Migrate:
    • Discovery and assessment
    • Dependency visualization
    • Migration execution
    • Cost: Free
    Azure Database Migration Service:
    • Database migration with minimal downtime
    • Supports SQL Server, MySQL, PostgreSQL
    • Cost: Free tier + paid options
    Azure Site Recovery:
    • VM replication for migration and DR
    • Supports VMware, Hyper-V, physical servers
    • Cost: $25/month per replicated machine

    Tool Selection

    AWS tools better for:
    • Large-scale migrations (1,000+ servers)
    • Complex database migrations
    • Heterogeneous environments
    Azure tools better for:
    • Windows-heavy environments
    • Hyper-V virtualization
    • Microsoft ecosystem integration
    Both adequate for most migrations. Choose based on target cloud provider.

    Key Takeaways

    • 74% of migrations exceed budget proper planning prevents 40-60% of cost overruns
    • Choose migration strategy per application one-size-fits-all approaches fail
    • Rehost fastest but misses cloud benefits replatform balances speed and optimization
    • Zero-downtime achievable with replication parallel operation eliminates migration windows
    • Pilot migration proves process learn on low-risk app before critical migrations
    • Data transfer takes longer than estimated plan for 2-3x estimated time
    • Dependency mapping critical 40-60% more dependencies than initially documented
    • Testing is non-negotiable functional, performance, and security testing prevent outages
    • ROI typically 16-24 months cost savings justify migration investment

    How Askan Technologies Executes Cloud Migrations

    We've completed 42 cloud migrations with 99.95%+ uptime achievement, helping clients reduce infrastructure costs 35-55% while maintaining business continuity.Our Cloud Migration Services:
    • Discovery and Assessment: Comprehensive application inventory and dependency mapping
    • Migration Strategy Design: Choose optimal migration approach per application
    • Pilot Execution: Prove migration process with low-risk application
    • Zero-Downtime Migration: Execute production migrations with minimal disruption
    • Compliance Support: Maintain regulatory compliance throughout migration
    • Post-Migration Optimization: Right-size and optimize for cost efficiency
    Recent Cloud Migrations:
    • Financial services: 8 applications, 14-month migration, zero downtime, 49% cost reduction
    • Healthcare platform: 12 applications to Azure, HIPAA compliant, 42% cost savings
    • E-commerce system: Refactored monolith to microservices on AWS, 62% cost reduction
    We deliver cloud migrations with our 98% on-time delivery rate and guaranteed uptime SLAs.

    Final Thoughts

    Cloud migration is inevitable for most organizations. Data center leases expire. Hardware ages. Competitors gain cloud advantages. The question isn't whether to migrate, but how to do it without destroying business continuity.The organizations succeeding with cloud migration in 2026 are those that treated it as business transformation, not IT project. They planned comprehensively before touching production. They proved their process with pilot migrations. They executed with zero-downtime strategies. They optimized after stability.The organizations failing are those that rushed migration without planning, chose one strategy for all applications, skipped testing, and discovered critical issues in production.Don't let data center lease deadlines force rushed migrations. Don't assume "lift-and-shift everything" is adequate strategy. Don't skip dependency mapping because it seems tedious.Start with discovery. Understand what you're migrating before committing to timelines. Choose migration strategies appropriate per application. Execute pilot migrations to prove your process.Your legacy applications can move to cloud without business disruption. But it requires planning, testing, and execution discipline that most organizations underestimate.Migrate strategically. Test thoroughly. Execute carefully. Optimize continuously.That's how successful enterprises achieve cloud transformation in 2026.
    Table of contents

    Recent blogs

    Explore our latest blog posts, filled with insights, trends, and valuable knowledge to keep you informed.

    Cloud Migration Strategies: Moving Legacy Applications to AWS/Azure Without Downtime

    Cloud migration is no longer a question of if, but when and how. By 2026,...

    7 March, 2026

    Read More

    FinOps for Engineering Teams: Making Developers Cost-Conscious Without Killing Innovation

    Engineering teams are excellent at solving technical problems. They’re terrible at managing cloud costs. Not...

    6 March, 2026

    Read More

    Where Learning Gets Real, Cauvery College for Women at Askan Technologies

    On 20th January 2026, Askan Technologies had the pleasure of hosting 80 enthusiastic Computer Application...

    6 March, 2026

    Read More